Projects
We’ve been lucky to have been a part of some ground-breaking builds and we’re proud of what we’ve accomplished. See a few of the things we’ve built.
HSBC Bank New Head Office
HSBC Bank New Head Office Project Name: Landscape Waterproofing – The Village – Cairo Country: Egypt Construction Period : 2011 City: Cairo Scope: Roofing System Main Contractor: CCC Consultant: ESG Download Case Study
SOD-TERRA SAND SYSTEM
A revolutionary concrete floor finishing system that transforms ordinary concrete into visually stunning, durable surfaces using natural sands in their original colors.
Key Features
- Natural aesthetic with original sand colors
- Exceptional durability and crack resistance
- UV-resistant formulation prevents fading
- Chemical and oil resistant surface
Applications
- Water features: lakes, pools, beaches
- Recreational areas and walkways
- Commercial spaces and resorts
- Indoor and outdoor environments
ARALDITE® PY 1092-2 / HARDENER HY 1092-2
Two-component solvent free system based on Araldite® epoxy resin. Low viscosity, transparent system, suitable as sealer for concrete and epoxy mortar floorings.
| Applications | |
|---|---|
| |
| Advantages | |
| |
| Key Data | A+B |
| Density at 25 °C ARALDITE® PY 1092-2 g/cm³ HARDENER HY 1092-2 g/cm³ | 1.15 1.00 |
| Recommended mix ratio ARALDITE® PY 1092-2 parts by weight HARDENER HY 1092-2 parts by weight | 100 60 |
| Viscosity of mix at 25°C mPaS | 300 |
ARATHANE RE
Two-component gloss Aliphatic polyurethane coating system. Provides excellent gloss and colour retention.
| Applications | |
|---|---|
| |
| Advantages | |
| |
| Key Data | A+B |
| Density at 25 °C Ready for use mix g/cm³ % Solids by volume | 1.18 ± 0.02 63 ± 2% |
| Recommended mix ratio Resin parts by weight Hardener parts by weight Diluent 5 % if needed parts by weight | Pigmented 90 10 5 Transparent 20 10 1.5 |
Application Process
Surface Preparation
Ensure surfaces are clean, dry, and free from dust, grease, and loose particles for optimal adhesion.
Mixing
Thoroughly mix resin and hardener components according to specified ratios for homogeneous application.
Application
Apply using brush, roller, or spray equipment within the pot life timeframe for best results.
Curing
Allow proper curing time based on ambient temperature and humidity conditions.
Ready to Transform Your Surfaces?
Sodeco Specialties specializes in waterproofing systems for all types of constructions and to protect from the damaging effects of water ingress.
EPDM Waterproofing System
Protect your artificial lakes and ponds with Sodeco’s high-performance EPDM waterproofing solution—engineered for durability, flexibility, and exceptional long-term performance in aquatic environments.
Key Features
- Flexible membrane adapts to any shape
- UV and weather resistant technology
- 100% safe for aquatic life
- Maintenance-free for decades
Why Choose Sodeco?
- 15+ years of waterproofing expertise
- Expert team & trained installers
- Proven success across Egypt & Gulf
- Comprehensive project warranty
Professional Installation Process
Surface Preparation
Lakebed and slopes expertly shaped by main contractor, following precise design drawings and specifications.
Geotextile Underlayment
Premium geotextile rolled across base and slopes with precise 15cm overlaps, secured with professional weights.
EPDM Liner Installation
High-grade EPDM liner carefully placed from deepest point outward, loosely laid and shaped to perfect contour.
Secure Anchoring
Excess liner professionally buried in engineered trench, backfilled and compacted for maximum security.
Ready to Protect Your Investment?
Get a professional assessment and customized waterproofing solution for your project
Request Site VisitWe use the latest injection systems to repair cracks that appear in concrete structures and foundations due to many different reasons.
We supply the full system at once depending on the most suitable method after studying the exact cause of the crack. Systems range from polyurethane and epoxy injections to patching compounds and caulk or liquid fillers.
LD-06 - LD-08 TOWERS-NEW ALAMEIN
- Project Name: LD-06 & LD-08 Towers
- Country: Egypt
- City: New Alamein
- Construction Period: 2018 – 2022
- Scope: Raft & Retaining Walls Waterproofing + Pile Heads Treatment
- Consultant: ECG
- Main Contractor: REDCON Construction (LD-06) Arab Contractors (LD-08)
- Owner: New Urban Communities Authority

NILE TOWERS-MASPERO
- Project Name: Nile Towers – Phase 1
- Country: Egypt
- City: Cairo
- Construction Period: 2022 – 2023
- Scope: Watertightness Works.
- Consultant: ACE – Moharram.Bakhoum
- Main Contractor: ORASCOM Construction
- Owner: New Urban Communities Authority

Tunnels Under Suez Canal
- Project Name : EPDM membrane works for raft
- Country: Egypt
- Construction Period: 2015 – 2018
- City: Ismailia
- Scope: Tunnels Under Suez Canal
- Owner: Ministry of Defense
- Main Contractor: Consortium Petrojet – Concord

Factory production & repair Armor (200 Harby)
- Project Name: Factory production & repair Armor (200 Harby)
- Country: Egypt
- Construction Period : 2014
- City: Abu Zaabal
- Scope : Full roofing system EPDM membrane works
- Main Contractor: Owner
- Owner: Factory production and repair Armor (200 Harby)

Mariott Hotel
- Project Name : Mariott Hotel
- Country: Egypt
- Construction Period : 2006 – 2007
- City: Cairo
- Scope : Roofing System
- Owner : Mariott LTD

City Light Project
- Project Name : City Light Project
- Country: Egypt
- Construction Period : 2009 – 2011
- City: Alexandria
- Scope : Raft & Retaining Walls Waterproofing + Pile Heads Treatment
- Owner : City Light for Investment

GSK Lactam Building
- Project Name : Landscape Waterproofing – The Village – Cairo
- Country: Egypt
- Construction Period : 2011
- City: Cairo
- Scope : Roofing System
- Consultant: Palm Hills for Development

Cairo Festival City
- Project Name: Cairo Festival City – Business Parks
- Country: Egypt
- Construction Period : 2011
- City: Cairo
- Scope : Roofing System.
- Consultant: ASG

The Village
- Project Name : Landscape Waterproofing – The Village – Cairo
- Country: Egypt
- Construction Period : 2011
- City: Cairo
- Scope : Roofing System
- Main Contractor: Palm Hills for Development















